6. Distribution

This is the sixth stop on the Tour

Return to Map Page
Pumps

Treated water leaves the clearwell through an 84-inch diameter pipeline. Part of the water flows directly into one of the transmission lines, which is gravity fed straight to your faucet.

The remaining water is piped to the Finished Water Pump Station (FWPS) where it is pumped to the other transmission lines.
Transmission Line

Four transmission lines carry the water from the Filter Plant into Everett and Snohomish County. Three transmission lines can be seen from the trestle on Highway 2 east of Everett. Two of these transmission lines carry treated drinking water. The third carries untreated water for industrial use at Kimberly-Clark Corp. A fourth line takes a southern route and can be seen from Homeacres Road west of Snohomish.

Next Stop - End Use


To continue on the tour click NEXT or you can move to any stop on the tour by clicking stops listed below.

1.

2.

3.

4.

5.

6.

7.

8.

Source

Storage

Coagulation
Floculation

Filtration

Disinfection

Distribution
You are here

End Use

Quality
Control

Return to Drinking Water Home Page